In the past we have covered the subject of surface impoundments in some detail. From design and operation to inspection and response actions, we have taken a close look at what that type of land disposal unit is used for and how one must be managed. Today we are going to take a similar look into hazardous waste piles.
The regulations concerning waste piles can be found in Part 264/265, Subpart L of 40CFR. Basically, a waste pile is a pile of noncontainerized solid, non-flowing hazardous waste. Waste piles are not a disposal method but merely serve as a storage and/or treatment option for generators. Because they are not an end-of-life stage for waste, Subpart L does not contain post-closure care regulations. However, waste piles do sometimes need to close with waste still in place. If this happens, the waste pile is closed as a landfill and is susceptible to all applicable regulations. This is discussed in more detail below.
According to the EPA, “owners and operators of permitted waste piles that meet special requirements are subject to reduced regulation. Specifically, the waste pile must be located inside or under a structure and not receive free liquid, protected from surface water run-on, designed and operated to control dispersal of waste, and managed to prevent the generation of leachate. If these standards are met, the owner and operator of the permitted waste pile are exempt from groundwater monitoring requirements, as well as the design and operation requirements for waste piles.”
The minimum technological requirements (MTRs) for waste piles are just about the same as those of surface impoundments. These requirements include the need for new units, lateral expansions, and replacement units to be equipped with a double liner and leachate collection and removal system (LCRS). Additionally, waste piles, with some exceptions, require a second leachate collection and removal system above the top liner.
A permitted waste pile that is not subject to MTR (things like units, lateral expansions, or replacements that were commenced before July 29, 1992) only needs to have one liner and meet basic LCRS requirements. The EPA states, “interim status waste piles that are not subject to MTR are subject only to liner, run-on, and run-off controls if leachate or runoff is found to be a hazardous waste.”
As mentioned earlier, a waste pile is a storage or treatment area as opposed to an end stage disposal option for hazardous waste. Because of this, prior to closure all waste residues and contaminated subsoils and equipment must be removed or decontaminated at closure. According to the EPA, “if an owner or operator removes or decontaminates all waste residues and makes all reasonable efforts to remove or decontaminate all structures and soils and finds that some contamination remains, the waste pile will then be subject to the closure requirements for landfills, including post closure care.”
As with many storage options, RCRA puts special requirements on storing ignitable or reactive wastes in waste piles because these types of materials “require continuous protection from conditions that could cause them to ignite or react.” Similarly, there are regulations prohibiting the placement of incompatible wastes or materials in the same waste pile unless certain precautions are taken to avoid incident. Lastly, if an owner/operator plans to manage dioxin-containing waste he or she must have a special management plan approved by the Regional Administrator or authorized state.
According to the EPA, “containment buildings, sometimes characterized as ‘indoor waste piles,’ are units used to hold noncontainerized piles of hazardous waste. The difference between waste piles and containment buildings, from a regulatory standpoint, is that containment buildings are not land disposal units. For this reason, containment buildings are designed with a container system rather than a liner and leak detection system.”
Quoted and EPA cited information (unless otherwise noted) for this blog post was gathered from the EPA document, “Introduction to Land Disposal Units.” As always, this blog post is not intended to be comprehensive and it is always best to check with the EPA and local government for full, up-to-date, rules and regulations.
VP of Health and Safety Jim Mangas discusses the importance of plant safety, maintenance, and reliability (featured in BIC Magazine July/Aug '22)
Highlighting some of the wonderful interns we have at Heritage this year!
In this blog we walk you through the process of fuel blending, where we can turn hazardous waste materials into a viable alternative fuel source.
Our 12th annual Habitat for Humanity Build
On August 28th, 2021, the Louisiana coast was battered by Hurricane Ida. This included our Port Fourchon Service Center, where the devastating hurrica
Heritage Thermal Services is pleased to announce that its collection of household hazardous wastes for the East Liverpool area returns for 2022.
VP of Health and Safety Jim Mangas discusses preparedness for unexpected conditions during a project. (featured in BIC Magazine March/April '22)
Rachel McGrogan speaks about her time as a Lab Chemist at Heritage.